翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Salzburg–Berchtesgaden railway : ウィキペディア英語版
Freilassing–Berchtesgaden railway



}}
}}
The Freilassing–Berchtesgaden railway is an electrified line listed in the Deutsche Bahn timetable as route 954. The 33.671 km long route branches in Freilassing as a single-track line from the double-track Rosenheim–Salzburg railway. It is classified as a line as far as Bad Reichenhall and from there as branch line. The section between Bad Reichenhall-Kirchberg and Hallthurm is considered a steep section with specific operational requirements under Deutsche Bahn’s regulations.
==History and former sidings==

The Freilassing–Bad Reichenhall section was opened in 1866. In 1867, a project for a railway from Reichenhall to Berchtesgaden was approved, with assistance from the Administration of the Bavarian mountains, iron works, and salt works ((ドイツ語:Administration der bayerischen Berg-, Hütten- und Salzwerke)). The construction of the Reichenhall–Berchtesgaden section was completed in 1884. On 25 October 1888 a festively decorated first train ran from Reichenhall to Berchtesgaden. The travel time for the entire route was initially 90 minutes and it was later reduced to 70 minutes. In 1914 the line was electrified. The AC power was supplied by the Saalach power station in Bad Reichenhall-Kirchberg, which is fed by lake Saalachsee and still supplies power for trains. The electric train operations started in 1916 with specially designed electric locomotives of class EP 3/6.
There was a 70 metre long tunnel on a curve near the former Gmundbrücke station at Tristram Gorge until 1933/34, when it was converted into a cutting because its profile it was too small following the introduction of 4-axle carriages.
From 1909 to 1965 there was a connection at the end of the line at Berchtesgaden to the Königssee Railway (''Königsseebahn'') to the lake of Königssee. Another connecting line existed from 1908 to 1938, the Berchtesgaden–Hangender Stein railway, also called the ''Grüne Elektrische'' (“Green Electric”). This line was connected in turn to the Salzburg–Hangender Stein railway, which was called the ''Rote Elektrische'' (“Red Electric”). During the Third Reich, this rail link was closed as part of the planned duplication of the railway and upgrading of the main road. Since then, buses have run here as the ''Watzmann Express''. Work on the railway upgrade was begun, but never completed due to the war. Even today, a tunnel without tracks near Berchtesgaden station is a reminded of the unfinished railway project.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Freilassing–Berchtesgaden railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.